info@makkidemolition.caCall Now: (403) 392-2803
Healthcare Asbestos Abatement: Foothills Medical Centre Boiler Room Project
Abatement Services

Healthcare Asbestos Abatement: Foothills Medical Centre Boiler Room Project

1403 29 Street NW, Calgary (Foothills Medical Centre)
Completed: March 2024

Makki Demolition, in conjunction with our specialized hazardous materials division, successfully completed a high-stakes asbestos abatement project at the Foothills Medical Centre, located at 1403 29 Street NW, Calgary. Performing remediation within an active hospital facility requires the highest level of technical expertise, as the project demanded zero-compromise air quality management and strict adherence to infection control protocols.

Learn more about our abatement services in Calgary.

Technical Scope: Hazardous Material Abatement

Full Asbestos Containment: Construction of a poly-sheeting enclosure to isolate the boiler room from the rest of the hospital

Negative Air Pressure Systems: Installation of industrial HEPA-filtered air scrubbers to ensure that no asbestos fibers could migrate outside the work zone

Mechanical System Stripping: Controlled removal of asbestos insulation from complex piping and mechanical assemblies

Operational Continuity: All work was sequenced to ensure the hospital's primary heating and utility systems remained functional

Project Gallery

Healthcare Asbestos Abatement: Foothills Medical Centre Boiler Room Project - Image 2

Safety Protocols & Environmental Controls

1

Strict Infection Control: We implemented specialized barriers and entry/exit decontamination chambers to protect patients and medical staff from any exposure

2

Alberta OH&S Compliance: Every phase of the project met or exceeded the Alberta Asbestos Abatement Manual requirements and provincial health and safety standards

3

Independent Air Monitoring: We coordinated with independent consultants for daily air sampling, ensuring the containment remained effective throughout the project duration

4

Final Clearance Testing: Before the containment was dismantled, abatement testing in Calgary was conducted via a third-party lab to confirm the area was 100% safe

Calgary's Certified Abatement Contractors

This project highlights Makki Demolition's ability to execute complex, high-risk work within NW Calgary's most sensitive public institutions. Our experience with mechanical room abatement ensures that facility managers can modernize their infrastructure without risking the safety of their occupants.

Need Similar Demolition Services?

Contact Makki Demolition today to discuss your project requirements. Our experienced team is ready to deliver safe, efficient, and professional demolition services tailored to your needs.